Latest company news about Why Did the Tubesheet Bulge, Leak, and Pull the Tubes Out? Three Failure Questions Engineers Actually Ask

November 10, 2026

Why Did the Tubesheet Bulge, Leak, and Pull the Tubes Out? Three Failure Questions Engineers Actually Ask

News Details

A fixed-tubesheet exchanger ran about 18 months before a minor leak appeared at the shell outlet. Inspection found no corrosion in the tubesheet and intact tubes, but the tubesheet centre had visibly bulged and several expanded joints near it had loosened. Material certificates and welding records were in order. The problem was not manufacturing. It was the load combination: differential pressure, differential thermal expansion and bolt load had aligned at the same location, and exceeded the assumption the tubesheet was checked against — pressure alone.

This article does not list failure modes. It answers the three questions engineers ask on site, and each answer traces back to a combination of the five loads acting on every tubesheet: tube-side and shell-side differential pressure, axial and hoop stress from pressure, thermal expansion mismatch, thermal stress from the tubesheet-to-shell temperature difference, and flange bolt load.

Q1. Why Does the Tubesheet Bulge and Leak?

The symptom is familiar: a bulge near the centre, a leak at the tube-to-tubesheet joint, a slow loss of bolt preload. Three loads combine to produce it.

Differential pressure creates a transverse bending load, resisted by tubesheet bending stiffness and by the tubes as an elastic foundation. The tubesheet-to-shell temperature difference adds an edge bending moment at that junction, and flange bolts add a third through gasket compression. Acting in one direction, these three push bending stress past the allowable; where the tubesheet is too thin for the combined load, deflection opens a leakage path at the tube joint. This is the most common in-service failure, a thickness and load-combination issue, not a material one.

Q2. Why Do Fixed-Tubesheet Tubes Buckle?

Here the tubesheet is intact and the tubes are the visible damage: bowed, bulged in the middle of the bundle, sometimes collapsed against each other. The cause is the one load a fixed-tubesheet design cannot release.

When shell and tubes run at materially different temperatures they expand differently. A fixed-tubesheet design cannot absorb that differential by relative movement, so it converts into axial stress in tubes and shell; beyond the critical buckling value the tubes bow. Floating-head or U-tube designs relieve it by allowing the bundle to move. The check that catches it is an explicit tube axial stress and critical buckling calculation — tubesheet bending alone does not.

Q3. Why Do Expanded Joints Pull Out?

The tube slides out of the tubesheet hole, the joint leaks, the tube end sits below the tubesheet face. The cause is axial force on the tube exceeding the holding capacity of the expanded joint.

That force sums the pressure-driven and thermal-expansion axial loads. When the sum exceeds joint capacity the tube pulls out. Pull-out is a joint design issue as much as a load issue: expansion length, expansion degree, groove geometry and tube wall thickness set the holding force, and it is not predicted by tubesheet bending stress — it needs a separate joint capacity check.

Three Design Actions Buyers and Engineers Should Verify
  • Tubesheet thickness must be governed by the worst load combination, not by design pressure alone. Check pressure-only, pressure-plus-thermal and bolt-load cases; the worst sets the thickness.
  • Fixed-tubesheet exchangers require an explicit tube buckling check. Axial compressive stress from differential expansion and the critical buckling load must be calculated, not inferred from the bending result.
  • Expanded joint capacity must be checked against the calculated axial load. Expansion length, expansion degree, groove geometry and tube wall thickness belong in the purchase specification, not left to the fabricator default.

For procurement and project engineers the review reduces to three questions on the drawing: which load combination governs tubesheet thickness, has the fixed-tubesheet buckling case been checked, and what axial load does the joint capacity correspond to? When those answers exist, the strength design is verifiable, not just plausible.

Frequently Asked Questions
Why does a heat exchanger tubesheet bulge and leak?

Differential pressure, junction thermal stress and bolt load can act in one direction; too thin a tubesheet then deflects and opens a leakage path at the tube joint.

Why do tubes buckle in a fixed-tubesheet exchanger?

Shell-to-tube temperature difference creates axial compressive stress that fixed tubesheets cannot release; beyond the critical buckling value the tubes bow. Floating-head and U-tube designs relieve it.

What causes tube pull-out from an expanded joint?

Axial force from pressure plus differential expansion exceeds joint capacity, set by expansion length, expansion degree, groove geometry and tube wall thickness.

Which load combination is most often overlooked in tubesheet design?

Differential pressure interacting with differential expansion: each may be acceptable alone, but together they can exceed allowable bending stress or joint capacity.

Heat exchanger tubesheet with drilled tube holes ready for tube bundle assembly

Heat exchanger tube bundle removed for tubesheet failure inspection