Place of Origin:
CHINA
Brand Name:
YUHONG
Certification:
ASME, ABS, DNV-GL , BV, LR , KR, CCS, PED, TUV, ISO9001, AD2000
Model Number:
ASME SA179
Yuhong Group Co., Ltd. manufactures high‑integrity tube bundles as well as complete shell & tube heat exchangers, pressure vessels, and air coolers. Our replacement bundles are built to match your existing equipment - same tube count, diameter, length, and baffle pattern - ensuring a seamless fit with zero field modification. Every bundle is fabricated under ASME code using certified carbon steel materials.
The carbon steel tube bundle is the removable core of a shell & tube heat exchanger. It consists of ASME SA179 seamless tubes rolled into an SA266 Gr.2 forged tubesheet, plus baffles, tie rods, and spacers. This bundle is designed for non‑corrosive or mildly corrosive services such as:
By replacing an old, fouled, or leaking bundle, you restore original thermal duty and avoid the cost of a new exchanger shell.
| Component | Material (ASME) | Key Feature |
|---|---|---|
| Tubes | SA179 | Seamless, cold‑drawn low‑carbon steel; excellent heat transfer. |
| Tubesheet | SA266 Gr.2 | Forged carbon steel - fine grain, high strength, precision drilled & grooved. |
| Baffles | SA516 Gr.70 | Segmental or double‑segmental pattern; supports tubes & directs shell‑side flow. |
| Tie Rods | SA193 B7 | High‑strength alloy steel; maintains baffle spacing. |
| Spacers | Carbon steel tube or solid bar | Position baffles accurately. |
| Sealing Strips (optional) | Carbon steel | Prevents shell‑side bypass around bundle periphery. |
To ensure a perfect fit, we need the following information (you can provide any of these):
| Aspect | Bundle Replacement | Complete Exchanger |
|---|---|---|
| Cost | Lower (30‑50% of new exchanger) | Higher |
| Lead time | Shorter (4‑6 weeks) | Longer (12‑20 weeks) |
| Piping modification | None | Usually required |
| Foundation / support | Unchanged | May need rework |
| Performance | Restored to original | Can be optimized |
Every carbon steel tube bundle shipped from Yuhong Group includes:
Contact jimmy@steelseamlesspipe.com with:
We will respond with a technical drawing, price, and delivery schedule within 48 hours.
Send your inquiry directly to us
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews