Custom AES Floating Head Shell & Tube Heat Exchanger SA516 Gr 70 Shells with SA266 Tubesheets

Miejsce pochodzenia: Chiny
Nazwa handlowa: YUHONG
Orzecznictwo: ASME, U STAMP, TEMA, API, EN, TUV, BV, SGS, ABS, PED
Numer modelu: AES, BES
Minimalne zamówienie: 1 szt
Cena: negocjowalne
Szczegóły pakowania: Paleta
Czas dostawy: 45 - 150 dni
Zasady płatności: T/T, akredytywa
Możliwość Supply: 100 szt miesięcznie
Zapytanie teraz
Zdobądź cytat.
Dane techniczne
Najważniejsze cechy

Custom AES floating head heat exchanger

,

SA516 Gr 70 shell heat exchanger

,

SA266 tubesheet heat exchanger

Materiał skorupy:
ASME SA516 GR.70
Materiał arkusza rur:
ASME SA266 gr.2 (znormalizowany)
Temperatura pracy:
-50°C do +400°C
Ciśnienie projektowe:
0,6–6,4 MPa (6–64 barów)
Średnica skorupy:
DN150 do DN1200
Obszar wymiany ciepła:
do 1500 m²
Opis produktu
Custom AES Floating Head Shell & Tube Heat Exchanger SA516 Gr 70 Shells with SA266 Tubesheets Yuhong Group Co., Ltd. is an ASME-certified manufacturer of shell and tube heat exchangers, pressure vessels, and air coolers, serving clients worldwide with equipment built to ASME Section VIII Division 1 and TEMA standards. Our product portfolio includes floating head, U-tube, and fixed tubesheet exchangers, as well as replacement tube bundles, U-tubes, heat exchanger tubes, finned
Ogólna ocena
3.7
Na podstawie ostatnich recenzji
Migawka oceny
5
0
4
67%
3
33%
2
0
1
0
Wszystkie recenzje
T
T*n z Canada
Dec 15.2025
The SA516 Gr485 material is known for its low-temperature toughness, and the vendor confirmed the impact testing met our specifications. Shipping to a remote location is always challenging, but the crating was heavy-duty and protected the unit during the long truck haul.
W
Wei Ming Tan z Malaysia
Nov 10.2025
The welding quality was excellent—clean and uniform. We also appreciated that the supplier provided both English and Bahasa Malaysia nameplates, which helped with our local inspectors.
A
A*i z United Arab Emirates
Jul 15.2025
Delivery was smooth—the unit arrived at Jebel Ali port within the promised timeframe, and the packaging protected it from the dusty environment during transport. Installation was quick because all flange alignments were perfect.
ZAŁĄCZONE PRODUKTY
Wyślij zapytanie