ASME U-Stamp Certified Shell-and-Tube Preheater with Duplex Stainless Steel Tube Bundle for Geothermal ORC Duty

Lugar de origen: Porcelana
Nombre de la marca: YUHONG
Certificación: ASME , U STAMP , PED, API , ABS, LR, DNV, GL , BV, KR, TS, CCS
Número de modelo: Intercambiadores de calor ASME
Cantidad de orden mínima: 1 juego
Precio: 1--1000000 USD
Detalles de empaquetado: Paleta
Tiempo de entrega: Entre 45 y 150 días
Condiciones de pago: LC, T/T
Capacidad de la fuente: 50Sets/Months
Consulta ahora
Obtener una cita
Presupuesto
Características destacadas

ASME U-Stamp Certified Shell-and-Tube Preheater

,

Duplex Stainless Steel Tube Bundle TEMA Heat Exchanger

,

Geothermal ORC Duty HP-LT Preheater

Código:
ASME VIII Div.1 + TEMA "C"
Tubo:
Acero inoxidable dúplex UNS S31803/2205
Caparazón:
El SA-516 Gr.70
Cabeza:
El SA-516 Gr.70
Tubo:
SA-266 Gr.2N
Asme:
Descripción de producto
ASME U-Stamp & TEMA Class "C" HP-LT Shell-and-Tube Preheater | Geothermal ORC Duty | n-Butane / Brine Service Product Overview This HP-LT Preheater is engineered for the 28 MW Mahanagdong Geothermal Power Plant Project (GEX 2810-28) of Energy Development Corporation, and manufactured in full compliance with ASME Boiler & Pressure Vessel Code Section VIII, Division 1 and TEMA Class "C" standards. Designed as a critical component in Organic Rankine Cycle (ORC) geotherma
Calificación general
4.7
Basado en reseñas recientes
Imagen de calificación
5
67%
4
33%
3
0
2
0
1
0
Todas las reseñas
S
Somchai Prasert de Thailand
Nov 13.2025
Even in our tropical heat, the heat transfer rate is exactly as promised. The shipping crate was very sturdy, arriving with no fins bent.
W
Wei Ming Tan de Malaysia
Nov 10.2025
The welding quality was excellent—clean and uniform. We also appreciated that the supplier provided both English and Bahasa Malaysia nameplates, which helped with our local inspectors.
N
Nguyen Van Nam de Vietnam
Oct 18.2025
Fast delivery and easy install. We scaled up our fertilizer plant and needed a quick turnaround. The lead time was better than expected. Flange alignments were perfect, which made the onsite installation very straightforward.
Productos relacionados
Enviar una consulta