ASME U-Stamp Certified Shell-and-Tube Preheater with Duplex Stainless Steel Tube Bundle for Geothermal ORC Duty

Lieu d'origine: Chine
Nom de marque: YUHONG
Certification: ASME , U STAMP , PED, API , ABS, LR, DNV, GL , BV, KR, TS, CCS
Numéro de modèle: Échangeurs de chaleur ASME
Quantité de commande min: 1 ensemble
Prix: 1--1000000 USD
Détails d'emballage: Palette
Délai de livraison: 45 à 150 jours
Conditions de paiement: LC, T/T
Capacité d'approvisionnement: 50Sets/Months
Demande maintenant
Obtenez une citation
Caractéristiques
Points marquants

ASME U-Stamp Certified Shell-and-Tube Preheater

,

Duplex Stainless Steel Tube Bundle TEMA Heat Exchanger

,

Geothermal ORC Duty HP-LT Preheater

Code:
ASME VIII Div.1 + TEMA "C"
Tube:
Acier inoxydable duplex UNS S31803/2205
Coquille:
Le SA-516 Gr.70
Tête:
Le SA-516 Gr.70
Palette de palerie:
SA-266 Gr.2N
Asme:
Oui
Description de produit
ASME U-Stamp & TEMA Class "C" HP-LT Shell-and-Tube Preheater | Geothermal ORC Duty | n-Butane / Brine Service Product Overview This HP-LT Preheater is engineered for the 28 MW Mahanagdong Geothermal Power Plant Project (GEX 2810-28) of Energy Development Corporation, and manufactured in full compliance with ASME Boiler & Pressure Vessel Code Section VIII, Division 1 and TEMA Class "C" standards. Designed as a critical component in Organic Rankine Cycle (ORC) geotherma
Notation globale
4.7
Basé sur les avis récents
Capture d'écran de notation
5
67%
4
33%
3
0
2
0
1
0
Toutes les critiques
S
Somchai Prasert depuis Thailand
Nov 13.2025
Even in our tropical heat, the heat transfer rate is exactly as promised. The shipping crate was very sturdy, arriving with no fins bent.
W
Wei Ming Tan depuis Malaysia
Nov 10.2025
The welding quality was excellent—clean and uniform. We also appreciated that the supplier provided both English and Bahasa Malaysia nameplates, which helped with our local inspectors.
N
Nguyen Van Nam depuis Vietnam
Oct 18.2025
Fast delivery and easy install. We scaled up our fertilizer plant and needed a quick turnaround. The lead time was better than expected. Flange alignments were perfect, which made the onsite installation very straightforward.
Produits connexes
Envoyez une demande